Best Smart Phone for Kids by Troomi

The most customizable and affordable smartphone for kids and teens—designed with powerful parental controls and built-in safety features.

A Samsung smartphone displays an orange home screen labeled Troomi Digital Wellness with app icons including Maps, Disney+, Angry Birds, Spotify, and Duolingo. The phones back is also partially visible.
Logos for NBC, ABC, Fox News, USA Today, and The Wall Street Journal are displayed in a row on a white background.

Plans & Pricing

No contracts, cancel anytime

Discover

Unlimited talk, text & apps

$34.95 /mo

*Most apps requiring internet access are available over WiFi only. Google Maps and GPS tracking are available anytime, anywhere.

**High-Speed Data (3GB), Smart Data (1GB)

Dream

Text Images & Groups

$29.95 /mo

Do

Basic Plan

$24.95 /mo

See Why Parents Trust Troomi for Their Kids

Adjust the phone to match your child's age and needs

Start with a basic phone for kids, then customize the settings to turn it into the ultimate feature-packed phone for teens.

Two teenage boys sitting side by side, each holding a smartphone. One boy in a yellow hoodie looks at his phone, while the boy in a denim shirt leans in, appearing curious about the other’s screen. Orange background.
A smiling woman with curly hair wearing a light green button-up shirt looks at and interacts with her smartphone, standing against a solid purple background.

Get notified about what's going on

The Troomi Phone provides parents with message previews, word clouds, graphs of who your child texts and when.

Safety You Can Trust

Safety is built into the Troomi phone from day one! Block unwanted apps, track GPS locations, monitor calls and texts, limit screen time, and keep kids safe with no social media or open internet.

Smiling girl with long brown hair wearing a blue shirt holds a smartphone in both hands, standing in front of a yellow background.
A smiling man and teenager sit together outdoors, facing each other and laughing, surrounded by green plants and warm lights, suggesting a casual, joyful conversation.

Troomi Features

A smartphone screen shows a parental control app with user profiles, time usage sliders, and toggles for enabling weekday and weekend schedules and communication limits. The app is set to limit Ryan’s phone use between 8AM and 8PM.

Message & Monitoring Analytics
Access insights across all message formats, including texts, images, videos and GIFs 

Simple Remote Control
Easily manage settings, approve contacts, and control app access from anywhere.

Screen Time Controls
Set personalized schedules and time limits for specific apps with ease.

Pre-Approved Apps
Select from over 120 apps that have been carefully reviewed and approved by Troomi.

Secure Browsing
Use our kid safe browser or disable the browser entirely. 

Approved Contact List
Easily manage a list of trusted contacts your child can communicate with.

Call Usage
Track call logs, durations, and history in our parent portal.

A young girl with long blonde hair, wearing a white t-shirt and blue jeans, smiles while using a smartphone. She stands against an orange background, framed by a smartphone screen outline.
Durability & Design
  • IP54 Splash & Dust Protection
  • Drop-resistant chassis to withstand bumps and tumbles
  • 164.4 x 77.9 x 7.9mm | 200g
Display
  • 6.7″ FHD+ Super AMOLED
  • Vision Booster
  • Blue light emissions shield
Camera
  • 50 MP Wide
  • 5 MP Ultra Wide
  • 2 MP Macro
Biometric Security
  • Fingerprint ID
  • Face Recognition ID
Performance & Battery
  • Processor: Exynos 1330
  • Memory (RAM): 4 GB
  • Storage: 128 GB with option to upgrade
  • Battery: 5,000 mAh
  • Charging: Supports 25W
Software & Security (Kid-Focused)
  • Operating System: Android 14
  • Updates: Includes 6 years of security and OS upgrades
  • KidSmart® OS: Troomi’s custom operating system
Connectivity & Features
  • Network: 5G Connectivity
  • GPS: Enables location services
  • Audio: Supports music streaming
Troomi offers a curated app store featuring pre-approved apps. Parents can select from this collection to determine which apps are available on their child’s device.

No, Troomi does not require a contract. We offer flexible month-to-month plans.

Troomi has no contracts! If you decide to cancel within the first 30 days, just return the phone to us. After that, you’re free to come and go with no obligations.
Yes, the Discover Plan lets you choose between the KidSmart® Browser—limited to parent-approved sites—or full access to Google Chrome.
You will need to purchase a Troomi phone since our software is integrated into the hardware.
Simply provide your account number and transfer PIN from your previous carrier, and Troomi will handle the rest. The process typically takes a few hours to a day, during which you can continue using your previous phone. Please note there is a $30 fee for number transfer.

Troomi has a 30-day, money-back guarantee! Return your device within 30 days of purchase for a refund minus shipping and any applicable repair fees.

You can bring the number with you! We make porting a number into Troomi as painless as possible. We’ll welcome you—and your phone number—with open arms. During the checkout process, you’ll see an option to port your existing phone number. All you need to do is input your phone number and PIN from your current carrier when prompted—we’ll do the rest!

Troomi uses Samsung Galaxy A Series phones, combining top-tier reliability with our exclusive safety features.

Once your Troomi phone arrives, just follow three simple steps. In under 10 minutes, you’ll be ready to start customizing controls for your child’s phone.